Bridge Over Virilla River Connecting Lindora and Belen Closed Again at Nights This Week

Share this article

Once again, the bridge over the Virilla River on the road that connects Lindora, Santa Ana with San Antonio de Belen, Heredia will be closed at night time starting this Sunday May 20th through Thursday, May 24 from 10 p.m. through 5 a.m.

This time, the closure is for the installation of the central part of the new bridge; in order to do this cranes will be working on both the existing bridge as in the parallel structure moving the metallic pieces, and therefore it is not possible to allow the transit of vehicles.

The bridge, 133 meters long and which will be complimentary to the current two lane bridge in order to offer drivers four lanes, should be finished by the end of June.

As an alternate route, users that travel from Belen or San Rafael de Alajuela to Santa Ana during the evening hours can use Route 27 accessing through San Rafael de Alajuela.

Print Friendly, PDF & Email

Comments

Popular Content